High Rise
High-rise buildings often involve deep basement excavations that extend well below the water table, necessitating robust dewatering systems. In these projects, dewatering is critical to maintain a dry and stable excavation site, ensuring the safety and structural integrity of the building.
Deepwell systems are commonly used for high-rise projects, as they are capable of handling significant groundwater levels over large excavation areas. In some cases, more advanced systems like eductor wells may be needed to deal with highly permeable soils or complex site conditions. Dewatering ensures that excavation and foundation work can proceed safely and on schedule, preventing delays caused by water intrusion or soil instability. Moreover, post-construction monitoring is often necessary to ensure long-term groundwater control.